You are here: Home > Bench Options > Installed in frame
 
 
Plugs Installed in Bench Frame  
 
Floor DS Rack

 

Compare:

  • Outlets are Installed in the Front or Back of the Bench Frame.
  • 10' Cord Included. UL Listed Parts.
  • Lighted Switch and Circuit Breaker Included.
Please specify front, back or down location. Select number of outlets below.
1-3 Day Shipp Promise
 
     
 
 
4 Plugs Installed-In-Frame Power Strips  
   
 
Description Model Weight
Installed in Back, Facing Back X4BB 4
Installed in Back, Facing Forward X4BF 4
Installed in Front, Facing Back X4FB 4
Installed in Front, Facing Forward X4FF 4
Installed Facing Down X4FD 4
 
  Lead Time: Green 1-3 Days, Orange 3-5 Days, Black 5-10 Days.
Large & custom orders take slightly longer.
 
     
 
8 Plugs Installed-In-Frame Power Strips  
   
 
Description Model Weight
Installed in Back, Facing Back X8BB 6
Installed in Back, Facing Forward X8BF 6
Installed in Front, Facing Back X8FB 6
Installed in Front, Facing Forward X8FF 6
Installed Facing Down X8FD 6
 
  Lead Time: Green 1-3 Days, Orange 3-5 Days, Black 5-10 Days.
Large & custom orders take slightly longer.